The setup time for Smart Breeze depends on the complexity of your factory environment, but in most cases the initial configuration can be completed within a short timeframe.
Because Smart Breeze works with existing OPC infrastructure, implementation is typically straightforward.
What is required for setup
To get started, the following components are usually needed:
access to the PLC environment
connection details of the OPC server
required user credentials
selection of tags and parameters to back up
preferred backup schedule
Once this information is available, the software can be configured quickly.
Typical setup steps
1. Connect to the OPC environment
The first step is connecting Smart Breeze to the existing OPC server.
This includes:
server address
connection method
authentication settings
connection test
2. Select backup tags
After the connection is active, the required PLC values are selected.
For example:
setpoints
recipe values
machine modes
process thresholds
3. Configure backup intervals
Next, the backup frequency is defined.
Typical intervals are:
every hour
every shift
daily
before maintenance
4. Test backup and restore
Before going live, a test backup and restore is usually performed.
This ensures that the configuration works correctly in the live environment.